KEY FACTS

PROJECT SUMMARY:

Clean and remove six 3,000-gallon underground storage tanks that were embedded in concrete.

ENVIRONMENTAL SERVICES:

Vacuum truck collected the existing contents as well as water used to clean the USTs. Collected materials turned over to licensed waste handler for disposal.

QUICK TURNAROUND:

Hulcher completed this project on short notice, in three days.
 

More Information On This Project:

Associated Services:


Equipment Used:

Industries Hulcher Serves:


Printable Version of the Hulcher Services Performs Tank Farm Removal Project on Six 3,000-Gallon Underground Storage Tanks (USTs) Case Study
Download Printable Version of the Hulcher Services Performs Tank Farm Removal Project on Six 3,000-Gallon Underground Storage Tanks (USTs) Case Study (PDF)

Hulcher Environmental Statement of Qualifications (SOQ) Brochure
Download Hulcher Environmental Statement of Qualifications (SOQ) Brochure (PDF)

Hulcher Download Environmental Summary
Download Environmental Summary (PDF)

Printable Version of the Tank Decommissioning Flyer
Download Printable Version of the Tank Decommissioning Flyer (PDF)

Printable Version of the Hi-rail Vacuum Truck Flyer
Download Printable Version of the Hi-rail Vacuum Truck Flyer (PDF)




Hulcher is Close to You!

Click map to view our locations

Our Services:

Industries Served:

Connect With Hulcher

Follow Hulcher  

More About Hulcher